Location: Surrey, BC
- Asphalt and Concrete Demolition and Disposal:
- Our skilled team meticulously dismantled existing asphalt and concrete structures.
- We ensured safe removal and proper disposal of debris, adhering to environmental guidelines.
- Excavation and Site Preparation:
- Precise excavation work followed, creating space for the upcoming project.
- We excavated over 20,000 cubic meters of soil, ensuring a stable foundation.
- Site preparation involved grading, leveling, and optimizing the terrain for construction.
- Backfilling:
- Strategic backfilling played a crucial role in supporting the landscape.
- We hauled in more than 54,000 tons of 3" minus, 3/4" clear crush rock and road base.
- Properly compacted and layered the backfill material to enhance stability.
- Machine Time:
- Our dedicated machinery logged over 2,000 hours during the project.
- Efficient equipment utilization contributed to timely completion.